|
|
Gold - Track Record
A few project profiles are provided:
(Click the headings for more information)
Centre of excellence provides internationally acclaimed leaching solutions
Bateman Engineering’s Centre of Excellence for Leaching provides the minerals resources industry with access to technology packages and historical proven designs for both primary and secondary copper leaching, complemented by leading expertise in the complete range of non-ferrous metal recovery processes.
Feasibility
study completed for Doris North at Miramar's Hope Bay
BATEMAN has been contracted by Miramar Mining Corporation to investigate
the potential to install an SAG (semi-autogenous grinding) mill to
reduce capital and operating costs on the proposed initial development
of the high-grade Doris North gold deposit at the Hope Bay project
in Nunavut, Canada.
Gold-recovery
complex for Uzbekistan
BATEMAN has been awarded a US$197,8M contract to revamp and modernise
a gold-recovery complex for the Navoi Mining and Metallurgical Kombinat
in the Republic of Uzbekistan. The complex will involve the No. 3
Hydrometallurgical plant, where a flotation process will be introduced,
and the expansion of mining facilities at the Kokpatas and Daugystau
gold deposits in the Kyzylkum desert. The proposed complex will process
5 Mt/yr of ore to produce 20 t/yr of gold.
The project will be funded by a structured finance package facilitated
by BATEMAN.
CBS
expands the Taror mill
Bateman Americas, Denver, is engaged in providing the on-site construction
management services for the second phase of the expansion of the milling
capacity at Taror mine, Tajikistan.

|